Operating Instructions for Film Applicator
Before starting the machine, check whether the fastening bolts of the equipment and devices are loose, wipe all the parts on the machine with thinner water, and then readjust the glue. It is forbidden to store any sundries on the workbench.
Sep 22,2022
1 Before starting the machine, check whether the fastening bolts of the equipment are loose, wipe all parts of the machine with thinner water, and then readjust the glue. It is forbidden to store any sundries on the workbench.
2 Close the main power switch, and check whether the start and stop of the host, the start and stop of gluing, the start and stop of winding, the heating of the drying channel, the power supply electrical switch for air extraction and the pointer of the instrument are flexible, reliable, sensitive and correct. After power on, observe whether the equipment operates normally and whether there is abnormal sound and burning smell.
3 After the machine is started, it is necessary to master the speed regulation of the drum, the temperature control of the drum and the temperature control of the drying tunnel. Strictly control the speed and temperature of the equipment.
4 After the equipment is started, it should run for 3~5 minutes without any load, test several films, check that they meet the requirements, and then conduct mass production without film test, and formal production is not allowed.